[ 新车上市] 5月30日,郑州日产Z9 GE PHEV(参数|询价)车型正式上市,共推出7款车型,售价区间为15.69-21.99万元。新车定位皮卡车型,采用1.5T发动机与电动机组成的插电式混合动力系统,拥有60公里与135公里两种纯电续航里程可选。
An aerial drone photo taken on March 19, 2025 shows the construction site of the Chinese-built Talanta Sports City in Nairobi, Kenya. (Xinhua/Han Xu)In Nairobi, a 60,000-seat football stadium is entering the final stage of construction. Built in just two years, the Talanta Stadium will serve as the main venue of the 2027 Africa Cup of Nations, co-hosted by Kenya, Uganda and Tanzania. "The schedule was extremely tight -- just two years, while comparable projects elsewhere usually take more than three," Du Xiao, project manager of the stadium for China Road and Bridge Corporation (CRBC), told Xinhua in a recent interview. "There is a very real sense of pride." According to Du, the stadium has no running track, bringing spectators close to the pitch. Its seats take on the green, red and black of Kenya's national flag, while the facade features the traditional shield and spear of the Maasai people. Upon completion, the stadium is set to be renamed the Raila Odinga International Stadium, in honor of Kenya's late former Prime Minister Raila Odinga. The roof adopts a cable-supported grid system erected with a "cable-first, steel-after" method, which Du said is the first of its kind independently designed and built by China. Without temporary steel supports, 48 radial cables are tensioned to lift six ring cables before steel trusses are laid on top, saving at least three months of construction time, with displacement controlled to the millimeter. In 2025 alone, some 1,300 containers of materials and equipment were shipped from China to the site. For CRBC, the stadium is only the latest chapter of a much longer story. The company built its first road in Kenya in 1984, and over 42 years, its footprint has extended from roads to bridges, ports, railways and buildings. Du Shan, the executive general manager of CRBC Kenya office, recalled that before 2008, Nairobi was cut apart by three rivers and a cross-district trip could take more than three hours. After CRBC completed the ring roads, the journey now takes about 50 minutes. The company is also expanding the A8, a national trunk road, from two lanes to four and six, she said. On the Mombasa-Nairobi Standard Gauge Railway, wildlife corridors were built with a clearance of more than six meters, "so that giraffes can pass with their heads held high," Du Shan said.
Workers are engaged at the construction site of the Chinese-built Talanta Sports City in Nairobi, Kenya, on March 18, 2025. (Xinhua/Han Xu)Du Xiao arrived in Kenya in August 2011 and has worked on the ring roads, the Mombasa-Nairobi railway, the Nairobi-Malaba railway and the Nairobi Expressway before taking on the stadium project. "Working overseas, we should not arrive thinking about changing the place. We should first adapt to and learn from the local community," he said. "What many projects truly open up is not just roads and railways, but trust between people." The stadium sits near Kibera, Kenya's largest informal settlement. Du Xiao remembers a local young man named Sammy, who had no skills when he applied for a job but volunteered for the project's equipment training and became a pump truck operator. "I asked him why he worked so hard. He said, 'I never thought I would have the chance to touch these machines. Now I feel I can support my whole family.'" According to Du Shan, the project recruited nearly 500 young workers from the neighborhood during construction, many of whom have qualified as assistant engineers, while about 280 local youths were mentored into technical backbones during the construction of the Mombasa-Nairobi railway. More than 350 CRBC employees have worked overseas for over a decade, and each year the company awards them a gold medal for long-term dedication, she said. "The medal is not only an honor, but also a kind of warmth. Because 42 years -- it has truly not been easy." When his child was born, Du Xiao was at a critical stage of the Nairobi Expressway project and could not make it home. "People in overseas engineering live in two worlds -- the project site on one side, the family on the other. All you can do is try to do a little better on each side," he said. "Maybe I will one day leave this country. But this stadium will remain," he said. "I came here to build projects. Then I found that this country has shaped who I am today." 。
郑州日产Z9 GE PHEV指导售价
纯电续航
车型
售价(万元)
60公里
60KM 后驱 标准版
15.69
60KM 四驱 标准版
16.99
135公里
135KM 后驱 标准版
16.89
135KM 后驱 智享版
17.59
135KM 四驱 探索版
17.99
135KM 四驱 豪华版
19.99
135KM 四驱 尊享版
21.99
新车特点郑州日产Z9 GE PHEV采用“Z-vision”设计语言,贯穿式LED日间行车灯搭配两侧“Z”字造型,并融合了远近光灯组。
B | 此外,新车前包围还采用了大尺寸的矩形进气格栅并搭配了蜂窝网状中网设计,前杠造型宽厚并使用银色装饰点缀,整体搭配保持了皮卡车型的硬朗风格,同时还融入科技元素。
E | 安全配置方面,新车配备800万像素“鹰眼+120度前视摄像头,同时搭配AEB自动紧急制动和FCW前方碰撞预警系统;新车还具备DOW开门预警、540度全景影像、透明引擎盖等14项智能安全功能。
动力方面,郑州日产Z9 GE PHEV全系搭载1.5T发动机与前置单电机组成的插电式混合动力系统,系统综合功率320千瓦,综合扭矩800牛·米。
F | 传动系统匹配4挡DHT混动专用变速箱。电池组方面,新车使用了国轩高科提供的32.85kWh磷酸铁锂电池组,CLTC工况下纯电续航里程135公里(另还有60公里续航车型可选),亏电状态下,百公里油耗为6.9L。新车还配备快充功能,从30%充电至80%仅需30分钟;此外,新车还具备6kW对外放电功能,可支持货箱内面板(交流)放电和快充口(直流)放电。
对比长城山海炮Hi4-T,该车型的定价相对较高,依托长城在皮卡市场深厚的品牌底蕴和广泛的用户基础,该车型在越野性能、品牌营销等方面具有不错的优势,对郑州日产 Z9 GE PHEV构成较大的竞争压力。
H | 不过,Z9 GE PHEV在价格相对较低的情况下,提供了丰富的配置和出色的综合性能,对于那些对价格较为敏感且追求性价比的消费者来说,具有较大吸引力。?
长安猎手作为增程式皮卡,在价格方面与郑州日产 Z9 GE PHEV有一定重合区间。其优势在于增程式动力系统在部分工况下的能耗表现以及可能相对成熟的增程技术应用。然而,Z9 GE PHEV的插电混动系统在动力输出的直接性和综合性能上可能更具优势,并且拥有更长的纯电续航里程,在日常通勤中可更多地依靠纯电行驶,进一步降低使用成本。?编辑点评随着消费升级和用户需求的多元化,皮卡市场正逐渐向乘用化、越野化、高端化方向发展。消费者不再仅仅将皮卡作为单纯的载货工具,而是希望其具备更多功能,能够满足家庭出行、户外越野、休闲娱乐等多种场景需求。近年来,国家对新能源汽车的支持力度不断加大,包括购车补贴、免征购置税等政策。虽然皮卡车型在新能源政策支持方面可能不如乘用车全面,但插电混动皮卡仍能享受到部分政策优惠,如免征购置税,这大大降低了消费者的购车成本。同时,一些城市对皮卡的限行政策也在逐渐放宽,允许皮卡进入更多区域,这为皮卡市场的发展提供了更广阔的空间。郑州日产 Z9 GE PHEV在舒适性、智能化、动力性能等方面的产品力,使这台定位皮卡的车型能够更好地融入消费者的日常生活,无论是城市通勤、周末出游还是户外作业,都能提供良好的体验,因此有望受到市场的广泛欢迎?。
I | (文/ 毕业)
。
Current article:http://www.minshixuanhabing.bond/list_0fgvm78/ofs.docx